Regulatory Compliance
(Alberta )
Maintaining compliance and keeping comprehensive, accurate documentation is critical to the reliable operation of the bulk electric system. With decades of experience across North America, we understand the complexities of regulatory requirements in each region. We help to ensure your equipment meets all necessary requirements and that your documentation is maintained and audit-ready.
Model Validation & Testing Standards
AESO Rule 503.19: Reactive Power Verification Testing
AESO Rule 503.20: Baseline and Model Validation Testing
Reporting Standards
PRC-019-AB-2: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
PRC-025-AB-2: Generator Load Reliability
Other Regional Requirements
AESO Rule 503.4: Voltage Regulation
AESO Rule 503.5: Voltage Ride-Through
AESO Rule 503.6: Frequency and Speed Governing
AESO Rule 503.7: Power System Stabilizer